Skip to content ↓

A Busy Half Term at Notton!

Although school has closed to students, work at Notton House hasn't stopped. It has been a busy half term!

We have some amazing wall murals up high to wonder at in the education block, a new look pastoral room for when the boys need time out, as well as a staff/ student chill out area with kitchen, also located in the education block; the library has had a quick revamp; the science room has been painted, and so has the front door of the school, as have the corridors upstairs on courtyard; the carpets have been cleaned in many areas; and we have new carpets in Fox Talbot House; new beds have been delivered and placed into bedrooms, as well as new sofas and chairs, which have been donated to the school; the roof on the education block has been repaired - hopefully the leaks have now stopped! The outdoor gym has been relocated so the boys can use this more. But the main event, is the revamped and restyled American Diner! Stage 1 is complete - the walls are bright and vibrant; stage two will soon happen with a new floor, and the final stage will be the American style murals across the walls! I am sure I have missed lots of other wonderful updates, but for now, enjoy the pics!